Meter deposit: $250 or sign up for automatic bill payment (print form)
New Service Connection fee: $400.00 single phase, $750.00 three phase
Transformer Charge $600.00 single phase, $2,650 three phase.
Aid to Construction-If primary line needs to be
installed, there will be an Aid to Construction charge assessed. This charge is
determined by the number of feet to be installed and if it is single phase or
three phase. The charge will be calculated when the work order is drawn up.
Meter
Installation
The electrician and/or customer will notify the Cooperative when the
installation of the customers meter socket is completed, and provide the
Cooperative with the Affidavit of Electrical Inspection. When that
is received, the Cooperative will install a meter.
Billing
Commencement
One (1) month after a line extension (primary wire installed and/or a
transformer installed) has been completed to the premises; the Cooperative will
commence billing the customer under the Cooperatives applicable rates and rules
for the type of service requested by the customer.
Line Extension
for a New Service-Contribution in Aid of Construction
FROM BEGINNING OF CONSTRUCTION SEASON TO SEPTEMBER 30:
The fee for a single phase line extension will be $5.00 per foot.
There will be a minimum of $450.00 for a single phase line extension when primary wire and/or a transformer has to be installed.
The fee for a three phase line extension will be $8.00 per foot.
There will be a minimum of $1,500.00 for a three phase line extension when primary wire and/or a transformer has to be installed.
Any unusual construction costs (permits, directional bores, frost charges, etc.) will be in addition to the costs above.
This must be paid prior to the start of construction.
FROM OCTOBER 1 TO END OF CONSTRUCTION SEASON:
The fee for a single phase line extension will be $6.00 per foot.
There will be a minimum of $500.00 for a single phase line extension when primary wire and/or a transformer has to be installed.
The fee for a three phase line extension will be $10.00 per foot.
There will be a minimum of $1,625.00 for a three phase line extension when primary wire and/or a transformer has to be installed.
Any unusual construction costs (permits, directional bores, frost charges, etc.) will be in addition to the costs above.
This must be paid prior to the start of construction.