Meter deposit: $100 or sign up for automatic bill payment (print form)
New Service Connection fee: $350.00 single phase, $1,350.00 three phase
Aid to Construction-If primary line needs to be
installed, there will be an Aid to Construction charge assessed. This charge is
determined by the number of feet to be installed and if it is single phase or
three phase. The charge will be calculated when the work order is drawn up.
Meter
Installation
The electrician and/or customer will notify the Cooperative when the
installation of the customers meter socket is completed, and provide the
Cooperative with blue copy of the Affidavit of Electrical Inspection. When that
is received, the Cooperative will install a meter.
Billing
Commencement
One (1) month after a line extension (primary wire installed and/or a
transformer installed) has been completed to the premises; the Cooperative will
commence billing the customer under the Cooperatives applicable rates and rules
for the type of service requested by the customer.
Line Extension
for a New Service-Contribution in Aid of Construction
From the beginning of construction season to September 30th, the fee
for a single phase line extension will be $4.50 per foot.
There will be a minimum of $400.00 for a
single phase line extension when primary wire and/or a transformer have to be
installed. The fee for a three phase line extension will be $8.50 per foot.
There will be a minimum of $1,000.00 for a
three phase line extension when primary wire and/or transformer have to be
installed. Any unusual construction costs such as: permits, directional
bores, frost charges, ect. will be in addition to the costs above.
This must be paid prior to the start of
construction.
From October 1st to the end of construction season, the cost for a
single phase line extension will be $5.50 per foot.
There will be a minimum of $450.00 for
single phase line extension when primary wire and/or a transformer have to be
installed. Any unusual construction costs such as: permits, directional
bores, frost charges, etc. will be in addition to the costs above.
This must be paid prior to the start of
construction.
Kandiyohi Power Cooperative • 8605 47th Street NE • PO Box 40 • Spicer Mn 56288-0040
Copyright Kandiyohi Power Cooperative. All Rights Reserved. Web Site Development by E*Tap Marketing.